The Alcrete System Build Process and Timeline

System Build

Alcrete’s System Build Timeline¬†is one of the most efficient and productive of its kind in Ireland. Our units are well insulated, airtight structures that can be erected in a short space of time by comparison to other modes of construction.

In total our Design, Manufacture, delivery and installation takes approximately 61 days. This includes coordination the design team, structural design, production of manufacturing drawings, excavation, installation of foundations, concrete filling, wall panel erection, Timber floor installation and structure completion. Once these elements are completed, Roof Trusses, finishes, external windows and doors, external insulation, electrical and plumbing fit outs can be installed, and the unit is complete.

It’s an intense process, with many essential components, however with thanks to our unique system build, it can be completed quickly and effectively within a favourable timeline.

Alcrete boasts one of the most practical and productive system builds in the UK and Ireland. Quicker completion time, teamed with our staffs’ experience and proficiency results in reliable, comfortable and sturdy structures that are incomparable to others. If you are interested in learning more about Alcrete’s System Build Timeline, please get in touch with the team today via our contact page.¬†